+91-9351235868
ssconstruction200214@gmail.com
parallax background

Projects

Year Name of Work Location Client Value (INR) Status
2019 220/132 KV GSS KALA AMB, Himachal Himachal Principal Employer-HPPTCIL TBEA Energy ( VTC) 110 Lakhs Upcoming
2019 400/220 KV GIS Khimanawas, Banaskantha, Gujarat (PGCIL) Gujarat Principal Employer-PGCIL (Gujarat) 750 Lakhs Ongoing
2019 400/220 KV GIS Khimanawas, Banaskantha, Gujarat Gujarat Principal Employer-PGCILKEC International ( VTC) 800 Lakhs Ongoing
2019 132/33 KV GSS Ghamurwali, Shri Ganga Nagar, Rajasthan Rajasthan Principal Employer-Adani Transmission Power LTD. ( VTC.) 125 Lakhs Completed
2019 400/220 KV GSS Raisar, Bikaner Rajasthan Rajasthan Principal Employer-RRVPNL ( ALSTOM T & D INDIA.) VTC 150 lakhs Completed
2019 Providing & laying cast-in-situ M-20 grade cement concrete Median Kerb with kerb casting machine laid between km 4+200 to km 55.00 wherever required on NH-15 in connection with widening & strengthening of existing Bikaner-Phalodi highway section. Rajasthan Employer-IRCON International Limited Principal Employer-NHAIi Completed
2018 Construction of Pre-stressed precast panel Boundary Wall at TP-01, RCC Drain Retaining Wall near KM. 11+000 & other miscellaneous works in connection with Widening and Strengthening jof existing Bikaner – Phalodi Section on NH- 15 in the State of Rajasthan.” Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 252 Lakhs Completed
2018 Construction of front Portion Boundary Wall with MS Railing & RCC Drain for the Rest Ara I between Km. 4+200 Km. 163+500 in connection with Widening and Srtrengthening of existing Bikaner-Phalodi Section on NH- 15 in the state of Rajasthan. Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 26.28 Lakhs Completed
2018 “Providing, Supplying & Fixing of RCC Bollards along Ramdevra Path between Km. 4+200 to Km. 163+500. Casting of Crash Barrier, Jersey Barrier tapered both end, Miscellaneous footings,Balance Retaining Wall, providing & fixing of MS Railing, Laying of PVC & GI Pipes at Toll Plaza- 01,02 & 03, Casting & fixing of jersey Barrier Tapered at one end between Km. 4+200 Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 498 Lakhs Completed
2018 “Construction of Furniture for Admin bulding, Cladding & Flooring for Admin building & Tunnel at Toll Plaza-01 & 02 and Residential Blocks & Water Storage tank for Toll Plaza-02 & 03 in connection with Widening and Strengthening of existing Bikaner-Phalodi Section on NH-15 in the State of Rajasthan. Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 40.25 Lakhs Completed
2018 Cast crash berier with friction slab over RE wall in Phalodi connection with “Widening and Strengthening of existing Bikaner-Phalodi Section to Four lane from 4.200 to 55.250 and Two lane with paved Shoulder from Km. 55.250 to Km. 163.500 of NH-15, in the state of Rajasthan “.
Package-III, (Two Lane from KM 105.000 to 163.500
te
Rajasthan Employer- RAVI INFRABULD PROJECTS PVT. LTD. Principal Employer-NHAI 67.98 Lakhs Completed
2018 “Supplying & fixing of MS Railing at different locations in between Km.
4+200 to Km. 163+500 in connectio with Widening and Strengrthening of existing Bikaner-Phalodi Section on NH-15 in the state of Rajasthan
Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 150 lakhs Completed
2017 Providing ,Supplying & Fixing of RCC Boundary Pillars, 200 meter Pillars, Kilometer Stone, 5th Kilometer Stone in between Km 4.200 to Km
163.500 and construction of Boundary Wall, RCC Retaining Wall & RCC Drain at Toll Plaza-01 in connection with Widening and Strengthening of existing Bikaner-Phalodi Section on NH-15 in the state of Rajasthan.
Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 561 Lakhss Completed
2017 Providing & Laying Cast in Situ M-20 grade Cement Concrete Median Kerb with Kerb Casting Machine laid &Providing & Painting with Synthetic enamel paint on Kerb, Crash Barrier etc. Between Km 4+200 to Km 163+500 wherever required on Nh-15 in connection with widening and strengthening jof existing Bikaner-Phalodi section. Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 631 Lakhs Completed
2017 “Deployment of Routine Maintenance Team (Patrolling Party) for Road Safety Measures/Appliances between Km.4+200 & 163+500 where ever reqfuired on NH-15 in connection with widening and strengthening of existing Bikaner-Phalodi Highway Project. Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 9.65 Lakhs Completed
2016 Providing, Supplying & Fixing of RCC Boundary Pillars, Chainage Pillars, & Delineatgor Cement Concrete Blocks Between Km. 4.200 to 163.500 on NH-15 in connection with Widening and Strengthening of Bikaner Phalodi Section.” Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 86.56 Lakhs Completed
2016 Construction of Utility Barrack at IRCON Camp No.-2, Km 127+000 Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 7.13 Lakhs Completed
2016 Providing & Laying Cast in Situ M-20 grade Cement Concrete Median Kerb with Kerb Casting Machine laid Between Km 4+200 to Km 55+0000 wherever required on Nh-15 in Rajasthan Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 483 Lakhs Completed
2009 Rehabilitation and strengrhening of exsting 2-lane Road and widening of carriage way to 4 lane Divided-Dual carriage way configuration of Dhule to Pimpalgaon (Km. 265 to Km. 380) Section of NH-3 – Construction of Drain between Ch. 104+510 to 104+620 (L/s)& 105+240 to 105+290 (L/s) of NH:3- Drain – Pkg 1 Maharashtra Employer-IRCON International Limited Principal Employer- State Highway 11.57 Lakhs Completed
2009 Two laning of section from Chomu to mMahla Via renwal jobner (SH- 8B,SH19,SH2C,SHG8A & ODR2) in the state of Rajasthan through PPP on Design, build, finance, Operate and Transfer (DBFOT) basis- Issue of LOA – Structure Work. Rajasthan Employer-Unity Infra Projects Ltd.

Principal Employer- State Highway

11.57 Lakhs Completed
2008 Rehabilitation and strengrhening of exsting 2-lane Road and widening of carriage way to 4 lane Divided-Dual carriage way configuration of Dhule to Pimpalgaon (Km. 265 to Km. 380) Section of NH-3 – Construction of various concrete chmpers for toll equipments & water sumps & (two nos) at Toll Plaza Complex at Dhule (ch.106+911) Rajasthan Employer-IRCON International Limited Principal Employer-NHAI 8.21 Lakhs Completed
2007 Ëarth work, Culvertws and bridges, drainage and protection work (Excluding ROB and Flyoers) between Km. 265 to 291 NH-3 on Maharashtra.”Construction of Culverts on labours contract basis -Reg. Rajasthan Employer-TOTEM PROJECTS Pvt. Ltd. Principal- NHAI (NH-3) 38.95 Lakhs Completed
2007 Excaation, Loading, Carting & Dumping of subgrade & shoulder material. (Earth Work) Employer-CHHINDWARA- AMARWARA- NARSING ROAD PROJECT
Principal Employer-STATE HIGHWAY PROJECT
M.P. (S.H. 47)
78.67 Lakhs Completed
2007 Construction of Pipe culverts, Slab Culverts, Box Culverts & Drains. Employer-CHHINDWARA- AMARWARA-
NARSING ROAD PROJECT
Principal Employer-STATE HIGHWAY PROJECT
M.P. (S.H. 47)
41.55 Lakhs Completed
2006 GSHP-7 Construction Package-62 for Stengthening of SH-5 from Godhra- Shamlaji Paving of Shoulders (Km.379/900 to Km.501/400) Construction of pavement layers at Km. 396+500 to Km.396+650 & widening of existing pipe at Km. 414+580 & its allies works (construction package- 62). Gujarat Employer-IRCON International Limited Principal Employer-GUJRAT STATE HIGHWAY PROJECT 5.02 Lakhs Completed
2005 GSHP-7 Construction Package-48R2 for Strengthening of SH-5 from Godhra-Shamlaji and paving of Shoulders (Km.379/900 to Km.501/400 ) – Construction of concete drains, Median Kerbs and Sidewalks in Malpus Town between Km. 451+000 to Km. 453+000 (Construction Package -48 R2). Gujarat Employer-IRCON International Limited

Principal Employer-GUJRAT STATE HIGHWAY PROJECT

18.20 Lakhs Completed
2005 GSHP-7 Construction Package-43R for Stengthening of SH-5 from Godhra- Shamlaji Paving of Shoulders (Km.379/900 to Km.501/400) Construction of balance works of CD No. 427/1 &436/1 (Construction Package-43 R Gujarat Employer-IRCON International Limited Principal Employer-GUJRAT STATE HIGHWAY PROJECT 7.38 Lakhs Completed
2005 Contract No. GSHP-7 for Strengthening of SH-5 from Godhra- Shamlaji and Paving of Shoulders (Km. 379/900 to Km. 501/400). Construction of head walls for pipe culvers of Access roads/intersections in between Km. 415+000 to Km. 453+000. Gujarat Employer-IRCON International Limited Principal Employer-GUJRAT STATE HIGHWAY PROJECT 4.20 Lakhs Completed
2005 GSHP-7 Construction Package-43R for Stengthening of SH-5 from Godhra- Shamlaji Paving of Shoulders (Km.379/900 to Km.501/400) Construction of Concrete Drains, Median Kerbs and Sidewalks in Malpur Town between Km. 451+000 to Km. 453+000(Contruction Package-48R2). Gujarat Employer-IRCON International Limited

Principal Employer-GUJRAT STATE HIGHWAY PROJECT

20.78 Lakhs Completed
2005 GSHP-7 Construction Package-49R3 for Stengthening of SH-5 from Godhra-Shamlaji Paving of Shoulders (Km.379/900 to Km.501/400) Construction of kerb with channle drain/Gutter, chute drains & Stilling Basins between Km. 430+000 Km. 53+000. (Construction Package-48R3). Gujarat Employer-IRCON International Limited

Principal Employer-GUJRAT STATE HIGHWAY PROJECT

29.89 Lakhs Completed
2004 Rehabilitation & Upgrading to 4/6 lane divided carriageway for Kishangarh Nasirabad-Bhilwara-Chittorgarh-Udaipur section of NH 79, NH 76 &NH 8- Package KU-IV from Bhilwara bypass & Bhilwar (Km. 120/0 of NH 79) to Chittorgarh (Km. 183/0 of NH 79 ) in the State of Rajasthan Labour charges of R R Masonry, Stone Pitching, Laying of PCC Grouted Pitching, Exacavation etc. Rajasthan Employer-RKI – B.SEENAIAH & CO. (PROJECTS) LIMITED

Principal Employer- NHAI

18.64 Lakhs Completed
2004 Rehabilitation & Upgrading to 4/6 lane divided carriageway for Kishangarh Nasirabad-Bhilwara-Chittorgarh-Udaipur section of NH 79, NH 76 &NH 8- Package KU-IV from Bhilwara bypass & Bhilwar (Km. 120/0 of NH 79) to Chittorgarh (Km. 183/0 of NH 79 ) in the State of Rajasthan Rajasthan Employer-RKI – B.SEENAIAH & CO. (PROJECTS) LIMITED
Principal Employer- NHAI
3.25 Lakhs Completed
2004 Painting of kerb stones on N.H. 11 Siker Road Package no JAI/ST/02. Work for painting of Kerbstone with Asian / Berger (White & Black ) Paint is herby awarded (This is Inclusive cleaning, material, labour) and safety arrangements. Rajasthan Employer-BHOORATHNAM & CO.
Principal Employer-NHAI
0.44 Lakhs Completed
2003 Rehabilitation & Upgrading to 4/6 lane divided carriageway for Kishangarh Nasirabad-Bhilwara-Chittorgarh-Udaipur section of NH 79, NH 76 &NH 8- Package KU-IV from Bhilwara bypass & Bhilwar (Km. 120/0 of Chittorgarh Employer- B.SEENAIAH & CO. (PROJECTS) LIMITED 18.49 Lakhs Completed